CONCEPT DEMONSTRATION
66Phillips 66Vessel Integrity Intelligence
← Vessel Registry

V-1261 — Rich MDEA Amine Vessel V-1261

Fluid Catalytic Cracker · Rich MDEA Amine service · Installed Aug 27, 2006 (20 yrs in service)

High
Current Min. Thickness
0.425 in
t-min 0.873 in
Measured Corrosion Rate
31.71 mpy
ML-predicted: 27.16 mpy
Remaining Life
0.0 yrs
Next Inspection Due
Feb 20, 2027
Interval: 0.5 yrs (API 510)

UT Thickness Trend

Minimum CML reading per inspection vs. ASME Sec. VIII t-min

Vessel Specification

MaterialSA-240 Duplex 2205
Design CodeASME BPVC Section VIII, Div. 1
Joint Efficiency0.85
Design Pressure309 psig
Design Temperature566 °F
Operating Pressure180 psig
Operating Temperature435 °F
Diameter119 in
Nominal Thickness1.036 in
Corrosion Allowance0.0938 in
H2S / Chloride1090 / 86 ppm
Flow Velocity2.9 ft/s
Process pH4.75
InsulatedNo

Corrosion & Remaining-Life What-If

Adjust operating conditions to see the live model-predicted corrosion rate and implied remaining life

Live Prediction — What-If Model
16.57 mpy
Predicted corrosion rate under these conditions (-15.14 mpy vs. current measured rate)
Implied Remaining Life
0.0 yrs
Implied Reinspection Interval
0.5 yrs

What-if model: standardized Ridge regression, R² 0.56 on held-out fleet data (3.25 mpy MAE). Runs entirely client-side for instant feedback — see Model Insights for the full fleet-scale ensemble model used for official predictions.

Governing Damage Mechanism — Amine Corrosion

API 571 §4.2.4

Localized corrosion in amine treating services, accelerated by high velocity, heat-stable salts, and CO2/H2S loading.

Recommended inspection approach: UT thickness at high-turbulence points (elbows, tees, reboiler returns); monitor amine quality (HSAS, degradation products).

Inspection History

UT thickness readings, most recent first

DateMethodCML CountAvg ThicknessMin CML Thickness
Aug 22, 2026UT Grid (API 572)40.4364 in0.4251 in
Aug 27, 2025UT Grid (API 572)40.4364 in0.4307 in
Jul 17, 2023UT Grid (API 572)40.4364 in0.4322 in
Aug 22, 2020UT Grid + RT40.5016 in0.4888 in
Aug 16, 2017UT Grid + RT40.6129 in0.5977 in
Feb 16, 2015UT Grid + RT40.7124 in0.7072 in
Jun 29, 2012UT Spot40.8113 in0.8046 in
Dec 27, 2010UT Grid + RT40.8696 in0.8639 in
Jan 23, 2008UT Grid + RT40.9844 in0.9812 in