V-1083 — Catalyst Slurry Vessel V-1083

Fluid Catalytic Cracker · Catalyst Slurry service · Installed Aug 30, 1993 (33 yrs in service)

Low-Medium
Current Min. Thickness
0.698 in
t-min 0.589 in
Measured Corrosion Rate
0.51 mpy
ML-predicted: 0.69 mpy
Remaining Life
60+ yrs
Next Inspection Due
Aug 19, 2036
Interval: 10.0 yrs (API 510)

UT Thickness Trend

Minimum CML reading per inspection vs. ASME Sec. VIII t-min

Vessel Specification

MaterialSA-516-70 Carbon Steel
Design CodeASME BPVC Section VIII, Div. 2
Joint Efficiency1.00
Design Pressure211 psig
Design Temperature240 °F
Operating Pressure143 psig
Operating Temperature147 °F
Diameter111 in
Nominal Thickness0.725 in
Corrosion Allowance0.0625 in
H2S / Chloride48 / 173 ppm
Flow Velocity19.5 ft/s
Process pH8.86
InsulatedYes

Corrosion & Remaining-Life What-If

Adjust operating conditions to see the live model-predicted corrosion rate and implied remaining life

Live Prediction — What-If Model
0.10 mpy
Predicted corrosion rate under these conditions (-0.41 mpy vs. current measured rate)
Implied Remaining Life
60+ yrs
Implied Reinspection Interval
10.0 yrs

What-if model: standardized Ridge regression, R² 0.56 on held-out fleet data (3.25 mpy MAE). Runs entirely client-side for instant feedback — see Model Insights for the full fleet-scale ensemble model used for official predictions.

Governing Damage Mechanism — Erosion-Corrosion

API 571 §4.2.13

Mechanical removal of protective scale by high-velocity flow or entrained solids, accelerating the underlying corrosion mechanism.

Recommended inspection approach: UT thickness at flow-direction changes (elbows, reducers); review process velocity against API RP 14E erosional velocity limits.

Inspection History

UT thickness readings, most recent first

DateMethodCML CountAvg ThicknessMin CML Thickness
Aug 22, 2026UT Grid + RT60.7106 in0.6980 in
Sep 3, 2024UT Grid + RT60.7096 in0.6973 in
Oct 22, 2022UT Grid (API 572)60.7118 in0.7040 in
Apr 3, 2021UT Grid + RT60.7101 in0.6945 in
Feb 3, 2019UT Spot60.7124 in0.6992 in
Jul 28, 2016UT Spot60.7120 in0.6966 in
Jan 19, 2015UT Grid (API 572)60.7120 in0.6967 in
Apr 11, 2013UT Grid (API 572)60.7188 in0.6991 in
Oct 26, 2011UT Grid + RT60.7164 in0.7115 in
Aug 28, 2009UT Grid + RT60.7161 in0.7057 in
Aug 6, 2007UT Spot60.7176 in0.7145 in
Oct 18, 2004UT Spot60.7212 in0.7119 in
Aug 27, 2002UT Spot60.7207 in0.7042 in
Jan 21, 2000UT Grid + RT60.7254 in0.7185 in
Aug 14, 1998UT Spot60.7202 in0.7070 in
Jun 10, 1996UT Spot60.7252 in0.7243 in